limitcast 0.14: pace your week by the day, and keep what trim must not touch
limitcast 0.14 adds three things: a keep-list so trim never touches what you rely on, a daily share of your weekly limit
that can now hold new subagents, and a status line that says which limit you will hit first.
0.14 makes limitcast's advice safer to apply and harder to ignore. trim can be told what to leave alone, the
daily pace acts instead of only showing, and status names the window that runs out first.
A keep-list for trim
limitcast trim --apply turns off MCP servers and hides skills you have not used. Some are rare but essential. Put them on
the keep-list and no --apply will touch them, in Claude Code, Codex or Grok:
$ limitcast trim keep ego-browser Kept by `trim --apply`: ego-browser
Spelling does not matter: ego-browser and ego_browser match. limitcast trim shows what it would
keep, limitcast trim keep --remove <name> drops one, and limitcast trim keep on its own lists them.
It is free.
Your week, paced by the day
The today column in limitcast status is your share of what is left of a weekly window, split evenly over
the days until it resets. In 0.14 it acts (Pro). With notifications on, you get one message a day when you have used 80% of today's
share:
limitcast: Claude 7d: 80% of today's share used, 1% left today.
Turn on limitcast budget today on and the subagent guard also holds new subagents once today's share is used up, until
local midnight:
limitcast: today's share of your Claude 7d limit is used up (6% of 5%). New subagents are held until midnight. Turn this off: `limitcast budget today off`, or set LIMITCAST_ALLOW=1 to spawn anyway.
The (6% of 5%) reads as 6% used against a 5% share for today. The hold is off by default. A window already at 100% is
left to the tool, and LIMITCAST_ALLOW=1 overrides it. Free installs record what Pro would have held, and
limitcast results shows it.
Which window runs out first
When a window is on pace to run out, limitcast status now ends with one line naming the one that hits the wall first and
where else there is room:
You'll hit Claude 5h first (16:40). Codex 5h has 78% left.
If you split work across Claude Code, Codex and Grok, that line tells you where to send the next task.
Upgrade
npm install -g limitcast limitcast status
Local only, never uses your Claude login. Feature guide · Pro plans
limitcast forecasts when each Claude Code, Codex and Grok window runs out, and its Pro plan stops runaway subagents before they burn the rest of it.
See what limitcast does · More posts · How the 5-hour and weekly limits work